Urban Redevelopment Authority ( URA)
Jalan Sendudok/Canberra Link Area
April 2018
Design 26.2m wide access road, 600mm & 450mm dia Sewer lines, drains(0.6m, 0.75m & 1m), culverts, for strengthening existing 3-cell box drain, new 3-cell culvert with 11m X 3m size of each cell, Tree planting, street lighting. Earthworks, roads, drains, 3-cell culverts, Sewers & Monholes, Tree planting, Grass turfing and miscellaneous works