We have been serving Singapore as a leading infrastructure contractor, having delivered major public sector projects for the Singapore authorities, agencies and statutory boards.

Choa Chu Kang Waterworks

Choa Chu Kang Waterworks

Building Works
Process Upgrading At Choa Chu Kang Waterworks Contract 2 – Ozone And Biologically Activated Carbon Facilities And Civil Works

Bishan Park

Bishan Park

ABC Waters Programme

ABC Waters Programme Proposed Development of Kallang River – Bishan Park (from Upper Thomson Road to Bishan Road)

Bukit Timah First Diversion Canal

Bukit Timah First Diversion Canal

Canal Improvement

Improvement to Bukit Timah First Diversion Canal Contract 3 (Holland Green to Clementi Road) (CJC-OKP JV 50:50)

Earthworks At Gali Batu

Earthworks At Gali Batu

Earthworks & Rock Excavation

Site clearance, Earthworks, Demolition and Rock excavation including stone blasting

J1018

J1018

Earthworks & Infrastructure Works

Advance Earthworks & Associated Works

TR238A

TR238A

Road Maintenance

Road Maintenance Contract for Central South and Central West

Changi Airport New Taxi Deck

Changi Airport New Taxi Deck

Building Works


Construction Of New Taxi Deck, Vehicular Bridges, Ramps And Associated Works At Singapore Changi Airport

Punggol Vehicular Bridge

Punggol Vehicular Bridge

Infra Works and Bridge

(A) Construction Of Sumang Walk (Part 4) And Vehicular Bridge Across Punggol Waterway

Sentosa Coach Park

Sentosa Coach Park

Building Works

Design And Construction Of Coach Parking Facility At Sentosa, Singapore

Tanglin Halt Infra

Tanglin Halt Infra

Flyover, Drains & Sewers

Proposed Construction Of Flyover, Drains, Sewers & Associated Works From North Buona Vista Drive To Commonwealth Avenue

Serangoon Reservoir

Serangoon Reservoir

ABC Waters Project

ABC Waters Project at Serangoon Reservoir, Sungei Pinang and Hougang Avenue 10 Part 1: Construction Works Part 2: Operation and Maintenance Services

Choa Chu Kang Pumping Station

Choa Chu Kang Pumping Station

Building Works

Construction of Pumping Station, Sewer Mains and Substation at Choa Chu Kang

Construction of Sentul Crescent Extension

Construction of Sentul Crescent Extension

Bridge Works

Project 1: Construction of Sentul Crescent Extension and Bridge over Punggol Waterway Project 2: Additions and Alterations to Seawall at Punggol Promenade

Buangkok Project

Buangkok Project

Earthworks & Infra Works

Construction Of Buangkok Crescent (Part), Buangkok Link (Part), Trunk Sewer, Site Clearance And Earthwork, Including Expunction Of Roads And Drainage Works In Hougang Town

Improvement To Sungei Pandan Kechil

Improvement To Sungei Pandan Kechil

Canal Improvement

ER393

ER393

Bridges and Flyovers
Proposed Flyover At West Coast Highway Across Jalan Buroh

C8282

C8282

MRT Works

Major Outstanding Works At Macpherson And Upper Paya Lebar Stations

Bukit Panjang N6 Project

Bukit Panjang N6 Project

Earthworks

Site Clearance & Earthworks at Bukit Panjang N6

Box Culvert at Marymount

Box Culvert at Marymount

Box Culvert Project

Proposed Box Culvert From Marymount Lane To Marymount Road

ER204

ER204

Road Widening

Widening of Jurong Town Hall Road from PIE to Boon Lay Way and Jurong East Central to AYE

Bukit Batok & Choa Chu Kang Project

Bukit Batok & Choa Chu Kang Project

Earthworks & Drains

(A) Site Clearance & Earthworks at Bukit Batok Town N4 (Part- South) and Choa Chu Kang Town N8 (Part-South) (B) Construction of Outlet Drains at Choa Chu Kang Town N8 (Part- South)

Bukit Merah & Queenstown Project

Bukit Merah & Queenstown Project

Earthworks

Site Clearance And Earthworks At Bukit Merah C50A/B And Queenstown RC25A

CR1087

CR1087

Sewer and Water Diversion

Sewer And Water Diversion Works (Package E)

Tuas View Extension Phase 2B

Tuas View Extension Phase 2B

Infra Works

Proposed Construction of Roads, Drains & Sewer at Tuas View Extn Phase 2B

Sentosa Palawan Beach Project

Sentosa Palawan Beach Project

Coastal Works

PART A – Beach Improvement Works at Palawan Beach – Sentosa

Site Clearance and Earthworks No. 7 in Sengkang Neighbourhood 4

Site Clearance and Earthworks No. 7 in Sengkang Neighbourhood 4

Earthworks

H1007

H1007

Demolition, Pile Extraction and Advance Earthworks

Bukit Batok N4

Bukit Batok N4

Earthworks & Infra Works

(A) Earthworks and Slope Formation at Bukit Batok N4 (Phase 2) (B) Construction of Roads, Drains and Sewers at Bukit Batok N4 and Extension of Bukit Batok West Ave 8

Changi Airport Flyover

Changi Airport Flyover

Bridges and Flyovers


Construction Of New Taxi Deck, Vehicular Bridges, Ramps And Associated Works At Singapore Changi Airport

Improvement To Sungei Seletar

Improvement To Sungei Seletar

Canal Improvement

Earth Stockpile Site At Changi East

Earth Stockpile Site At Changi East

Earthworks

ER104

ER104

Road and Bridge Widening

Widening of Kranji Expressway from Bukit Timah Expressway To Pan Island Expressway

Road Works at Tuas South Way

Road Works at Tuas South Way

Infra Works

Construction of Road, Drains & Sewers at Tuas South Way

JTC C13102011

JTC C13102011

Infra Works


Construction of Roads, Drains, Sewers and Ancillary Works at Finger One, Tuas View Extension

Jurong Island

Jurong Island

Infra Works

Proposed Construction of Roads, Drains, Sewers and Service Tunnels at Meranti Ave Extn and Angsana Road, Jurong Island

Proposed Construction of Roads, Drains and Sewers at Tembusu Drive, Jurong Island

Proposed Construction of Roads, Drains and Sewers at Tembusu Drive, Jurong Island

Bridge Works

JTC 66/2004

JTC 66/2004

Infra Works

Construction of Roads, Drains, Sewers and Soil Improvement – Works at Meranti Crescent, Jurong Island

JTC 44/2006

JTC 44/2006

Infra Works


Construction Of Roads, Drains, Sewers And Soil Improvement Works at Tembusu Crescent, Phase B, Jurong Island

Construction Of Sewers in Jurong Island

Construction Of Sewers in Jurong Island

Sewer Line Works

Gambas Project

Gambas Project

Abstraction Pond

Construction Of An Abstraction Pond And Ancillary Facilities At Gambas Avenue

Choa Chu Kang Cemetery (Phase 3B

Choa Chu Kang Cemetery (Phase 3B

Cemetery Works


Proposed Redevelopment Of Choa Chu Kang Cemetery (Phase 3B)

Jalan Sendudok Project

Jalan Sendudok Project

Earthworks & Infra Works

Design Development and Construction of the Proposed Infrastructre Works at Jalan Sendudok/Canberra Link Area – 2nd Stage

Development of Choa Chu Kang Cemetery

Development of Choa Chu Kang Cemetery

Cemetery Works

Choa Chu Kang Cemetery (Phase 3A)

Choa Chu Kang Cemetery (Phase 3A)

Cemetery Works


Proposed Redevelopment Of Choa Chu Kang Cemetery (Phase 3A)

Construction of Canberra Street

Construction of Canberra Street

Infra Works

Construction of Canberra Street (Part 1) Canberra Crescent (Part 1) and Canberra Walk at Sembawang Town Neighbourhood 1

NUS Infra Works Project

NUS Infra Works Project

Infra Works

Proposed Infrastructure (Civil, Structural, Mechanical and Electrical) at the University Town, NUS

C426

C426

Expressway Construction

Kallang/ Paya Lebar Expressway

Physical Barriers at Pulau Ubin

Physical Barriers at Pulau Ubin

Coastal Works

Proposed Physical Barriers At Pulau Ubin And Safti Live Firing Area

Earthworks at Ang Mo Kio

Earthworks at Ang Mo Kio

Earthworks & Drains

Earthwork and Drainage Diversion at Ang Mo Kio Ave 5 (Serangoon Planning Area)

Changi Point Project

Changi Point Project

Coastal Works

Proposed Boardwalk at Western Coastline at Changi Point

Pulau Semakau Offshore Landfill Project

Pulau Semakau Offshore Landfill Project

Landfill Works

Pulau Semakau Offshore Landfill Facilities for the Operation and Maintenance of Landfill Equipment Vehicles

Warren Golf Course

Warren Golf Course

Golf Course

Development of Warren Golf and Country Club Golf Course at Choa Chu Kang Way

Buggy Track and Drainage Improvement at Sime Course

Buggy Track and Drainage Improvement at Sime Course

Golf Course

Proposed Buggy Track and Drainage Improvement at Sime Course at Bukit Location for Singapore Island Country Club

Mount Faber Park Landscaping

Mount Faber Park Landscaping

Hardscaping


Hard Landscaping Works for the Redevelopment of Mount Faber Park

Development of Hindhede Nature Park

Development of Hindhede Nature Park

Landscaping

Development of Hindhede Nature Park on Lot 1176 MK 16, Hindhede Nature Drive, Singapore

Construction of Temporary Access Road at the Southern Island

Construction of Temporary Access Road at the Southern Island

Road Works

Tuas View Reclaimed Land

Tuas View Reclaimed Land

Sludge Works

The Loading and Transportation of Sludge from Various Sewage/Sludge Treatment Works To Tuas View Reclaimed Land

Site Clearance and Infrastructure works for Stockpiling Site at Seletar

Site Clearance and Infrastructure works for Stockpiling Site at Seletar

Infra Works

Removal of Soil Embankment at Singapore Changi Airport

Removal of Soil Embankment at Singapore Changi Airport

Earthworks

Proposed Streetworks To Woodlands

Proposed Streetworks To Woodlands

Road Works

Proposed Streetworks To Woodlands Drive 17 / Champions Way / Woodlands Ave 1, 4 And 12

RD145

RD145

Bridge Works


Upgrading Of Vehicular Bridges At 10 Locations

Sentosa Causeway Bridge

Sentosa Causeway Bridge

Bridge Works

Proposed Diversion of Services, Construction of New Services Platform & Conversion of Walkway to Roadway at Sentosa Causeway Bridge, Gateway Ave

Tiong Bahru Project

Tiong Bahru Project

Drains & Sewers

Diversion of Drain & Minor Sewer Works at Kim Tian Road (Bukit Merah Planning Area) – Tiong Bahru

Lagoon Works at St John Island

Lagoon Works at St John Island

Dredging Works

Proposed Construction of Lagoon Works at St John Island

Drainage Improvement on Pulau Tekong Contract 1

Drainage Improvement on Pulau Tekong Contract 1

Drainage Work

Choa Chu Kang Waterworks

Choa Chu Kang Waterworks

Building Works

Process Upgrading At Choa Chu Kang Waterworks Contract 2 – Ozone And Biologically Activated Carbon Facilities And Civil Works

Bishan Park

Bishan Park

ABC Waters Programme

ABC Waters Programme Proposed Development of Kallang River – Bishan Park (from Upper Thomson Road to Bishan Road)

Bukit Timah First Diversion Canal

Bukit Timah First Diversion Canal

Canal Improvement

Improvement to Bukit Timah First Diversion Canal Contract 3 (Holland Green to Clementi Road) (CJC-OKP JV 50:50)

Serangoon Reservoir

Serangoon Reservoir

ABC Waters Project

ABC Waters Project at Serangoon Reservoir, Sungei Pinang and Hougang Avenue 10 Part 1: Construction Works Part 2: Operation and Maintenance Services

Improvement To Sungei Pandan Kechil

Improvement To Sungei Pandan Kechil

Canal Improvement

Box Culvert at Marymount

Box Culvert at Marymount

Box Culvert Project

Proposed Box Culvert From Marymount Lane To Marymount Road

Improvement To Sungei Seletar

Improvement To Sungei Seletar

Canal Improvement

Drainage Improvement on Pulau Tekong Contract 1

Drainage Improvement on Pulau Tekong Contract 1

Drainage Work

Tuas View Reclaimed Land

Tuas View Reclaimed Land

Sludge Works

The Loading and Transportation of Sludge from Various Sewage/Sludge Treatment Works To Tuas View Reclaimed Land

J1018

J1018

Earthworks & Infra Works

Advance Earthworks & Associated Works

TR238A

TR238A

Road Maintenance

Road Maintenance Contract for Central South and Central West

ER393

ER393

Bridges and Flyovers

Proposed Flyover At West Coast Highway Across Jalan Buroh

ER204

ER204

Road Widening

Widening of Jurong Town Hall Road from PIE to Boon Lay Way and Jurong East Central to AYE

C8282

C8282

MRT Works

Major Outstanding Works At Macpherson And Upper Paya Lebar Stations

CR1087

CR1087

Sewer and Water Diversion

Sewer And Water Diversion Works (Package E)

H1007

H1007

Demolition, Pile Extraction and Advance Earthworks

ER104

ER104

Road and Bridge Widening

Widening of Kranji Expressway from Bukit Timah Expressway To Pan Island Expressway

C426

C426

Expressway Construction

Kallang/ Paya Lebar Expressway

RD145

RD145

Bridge Works

Upgrading Of Vehicular Bridges At 10 Locations

Earthworks At Gali Batu

Earthworks At Gali Batu

Earthworks & Rock Excavation

Site clearance, Earthworks, Demolition and Rock excavation including stone blasting

Tanglin Halt Infra

Tanglin Halt Infra

Flyover, Drains & Sewers

Proposed Construction Of Flyover, Drains, Sewers & Associated Works From North Buona Vista Drive To Commonwealth Avenue

Jurong Island

Jurong Island

Infra Works

Proposed Construction of Roads, Drains, Sewers and Service Tunnels at Meranti Ave Extn and Angsana Road, Jurong Island

Road Works at Tuas South Way

Road Works at Tuas South Way

Infra Works

Construction of Road, Drains & Sewers at Tuas South Way

JTC C13102011

JTC C13102011

Infra Works


Construction of Roads, Drains, Sewers and Ancillary Works at Finger One, Tuas View Extension

Tuas View Extension Phase 2B

Tuas View Extension Phase 2B

Infra Works

Proposed Construction of Roads, Drains & Sewer at Tuas View Extn Phase 2B

JTC 44/2006

JTC 44/2006

Infra Works


Construction Of Roads, Drains, Sewers And Soil Improvement Works at Tembusu Crescent, Phase B, Jurong Island

JTC 66/2004

JTC 66/2004

Infra Works

Construction of Roads, Drains, Sewers and Soil Improvement – Works at Meranti Crescent, Jurong Island

Proposed Construction of Roads, Drains and Sewers at Tembusu Drive, Jurong Island

Proposed Construction of Roads, Drains and Sewers at Tembusu Drive, Jurong Island

Bridge Works

Construction Of Sewers in Jurong Island

Construction Of Sewers in Jurong Island

Sewer Line Works

Construction of Sentul Crescent Extension

Construction of Sentul Crescent Extension

Bridge Works

Project 1: Construction of Sentul Crescent Extension and Bridge over Punggol Waterway Project 2: Additions and Alterations to Seawall at Punggol Promenade

Buangkok Project

Buangkok Project

Earthworks & Infra Works

Construction Of Buangkok Crescent (Part), Buangkok Link (Part), Trunk Sewer, Site Clearance And Earthwork, Including Expunction Of Roads And Drainage Works In Hougang Town

Bukit Panjang N6 Project

Bukit Panjang N6 Project

Earthworks

Site Clearance & Earthworks at Bukit Panjang N6

Punggol Vehicular Bridge

Punggol Vehicular Bridge

Infra Works and Bridge

(A) Construction Of Sumang Walk (Part 4) And Vehicular Bridge Across Punggol Waterway (B) Construction Of Sumang Walk (Part 5) And Sumang Link (Part 2) (C) Construction Of Trunk Sewer No. 22 Along Sumang Walk And Sumang Link

Choa Chu Kang Pumping Station

Choa Chu Kang Pumping Station

Building Works

Construction of Pumping Station, Sewer Mains and Substation at Choa Chu Kang

Earth Stockpile Site At Changi East

Earth Stockpile Site At Changi East

Earthworks

Bukit Batok & Choa Chu Kang Project

Bukit Batok & Choa Chu Kang Project

Earthworks & Drains

(A) Site Clearance & Earthworks at Bukit Batok Town N4 (Part- South) and Choa Chu Kang Town N8 (Part-South) (B) Construction of Outlet Drains at Choa Chu Kang Town N8 (Part- South)

Bukit Merah & Queenstown Project

Bukit Merah & Queenstown Project

Earthworks

Site Clearance And Earthworks At Bukit Merah C50A/B And Queenstown RC25A

Sentosa Palawan Beach Project

Sentosa Palawan Beach Project

Coastal Works

PART A – Beach Improvement Works at Palawan Beach – Sentosa

Construction of Canberra Street

Construction of Canberra Street

Infra Works

Construction of Canberra Street (Part 1) Canberra Crescent (Part 1) and Canberra Walk at Sembawang Town Neighbourhood 1

Construction of Temporary Access Road at the Southern Island

Construction of Temporary Access Road at the Southern Island

Road Works

Site Clearance and Infrastructure works for Stockpiling Site at Seletar

Site Clearance and Infrastructure works for Stockpiling Site at Seletar

Infra Works

Site Clearance and Earthworks No. 7 in Sengkang Neighbourhood 4

Site Clearance and Earthworks No. 7 in Sengkang Neighbourhood 4

Earthworks

Bukit Batok N4

Bukit Batok N4

Earthworks & Infra Works

(A) Earthworks and Slope Formation at Bukit Batok N4 (Phase 2) (B) Construction of Roads, Drains and Sewers at Bukit Batok N4 and Extension of Bukit Batok West Ave 8

Construction of Sentul Crescent Extension

Construction of Sentul Crescent Extension

Bridge Works

Project 1: Construction of Sentul Crescent Extension and Bridge over Punggol Waterway Project 2: Additions and Alterations to Seawall at Punggol Promenade

Buangkok Project

Buangkok Project

Earthworks & Infra Works

Construction Of Buangkok Crescent (Part), Buangkok Link (Part), Trunk Sewer, Site Clearance And Earthwork, Including Expunction Of Roads And Drainage Works In Hougang Town

Bukit Panjang N6 Project

Bukit Panjang N6 Project

Earthworks

Site Clearance & Earthworks at Bukit Panjang N6

Punggol Vehicular Bridge

Punggol Vehicular Bridge

Infra Works and Bridge

(A) Construction Of Sumang Walk (Part 4) And Vehicular Bridge Across Punggol Waterway (B) Construction Of Sumang Walk (Part 5) And Sumang Link (Part 2) (C) Construction Of Trunk Sewer No. 22 Along Sumang Walk And Sumang Link

Choa Chu Kang Pumping Station

Choa Chu Kang Pumping Station

Building Works

Construction of Pumping Station, Sewer Mains and Substation at Choa Chu Kang

Earth Stockpile Site At Changi East

Earth Stockpile Site At Changi East

Earthworks

Bukit Batok & Choa Chu Kang Project

Bukit Batok & Choa Chu Kang Project

Earthworks & Drains

(A) Site Clearance & Earthworks at Bukit Batok Town N4 (Part- South) and Choa Chu Kang Town N8 (Part-South) (B) Construction of Outlet Drains at Choa Chu Kang Town N8 (Part- South)

Bukit Merah & Queenstown Project

Bukit Merah & Queenstown Project

Earthworks

Site Clearance And Earthworks At Bukit Merah C50A/B And Queenstown RC25A

Sentosa Palawan Beach Project

Sentosa Palawan Beach Project

Coastal Works

PART A – Beach Improvement Works at Palawan Beach – Sentosa

Construction of Canberra Street

Construction of Canberra Street

Infra Works

Construction of Canberra Street (Part 1) Canberra Crescent (Part 1) and Canberra Walk at Sembawang Town Neighbourhood 1

Construction of Temporary Access Road at the Southern Island

Construction of Temporary Access Road at the Southern Island

Road Works

Site Clearance and Infrastructure works for Stockpiling Site at Seletar

Site Clearance and Infrastructure works for Stockpiling Site at Seletar

Infra Works

Site Clearance and Earthworks No. 7 in Sengkang Neighbourhood 4

Site Clearance and Earthworks No. 7 in Sengkang Neighbourhood 4

Earthworks

Bukit Batok N4

Bukit Batok N4

Earthworks & Infra Works

(A) Earthworks and Slope Formation at Bukit Batok N4 (Phase 2) (B) Construction of Roads, Drains and Sewers at Bukit Batok N4 and Extension of Bukit Batok West Ave 8

Sentosa Coach Park

Sentosa Coach Park

Building Works

Design And Construction Of Coach Parking Facility At Sentosa, Singapore

Sentosa Causeway Bridge

Sentosa Causeway Bridge

Bridge Works

Proposed Diversion of Services, Construction of New Services Platform & Conversion of Walkway to Roadway at Sentosa Causeway Bridge, Gateway Ave

Jalan Sendudok Project

Jalan Sendudok Project

Earthworks & Infra Works

Design Development and Construction of the Proposed Infrastructre Works at Jalan Sendudok/Canberra Link Area – 2nd Stage

Choa Chu Kang Cemetery (Phase 3B)

Choa Chu Kang Cemetery (Phase 3B)

Cemetery Works


Proposed Redevelopment Of Choa Chu Kang Cemetery (Phase 3B)

Choa Chu Kang Cemetery (Phase 3A)

Choa Chu Kang Cemetery (Phase 3A)

Cemetery Works


Proposed Redevelopment Of Choa Chu Kang Cemetery (Phase 3A)

Development of Choa Chu Kang Cemetery

Development of Choa Chu Kang Cemetery

Cemetery Works

Pulau Semakau Offshore Landfill Project

Pulau Semakau Offshore Landfill Project

Landfill Works


Pulau Semakau Offshore Landfill Facilities for the Operation and Maintenance of Landfill Equipment Vehicles

Changi Point Project

Changi Point Project

Coastal Works


Proposed Boardwalk at Western Coastline at Changi Point

Physical Barriers at Pulau Ubin

Physical Barriers at Pulau Ubin

Coastal Works


Proposed Physical Barriers At Pulau Ubin And Safti Live Firing Area

Lagoon Works at St John Island

Lagoon Works at St John Island

Dredging Works


Proposed Construction of Lagoon Works at St John Island

Tiong Bahru Project

Tiong Bahru Project

Drains & Sewers


Diversion of Drain & Minor Sewer Works at Kim Tian Road (Bukit Merah Planning Area) – Tiong Bahru

NUS Infra Works Project

NUS Infra Works Project

Infra Works


Proposed Infrastructure (Civil, Structural, Mechanical and Electrical) at the University Town, NUS

Gambas Project

Gambas Project

Abstraction Pond


Construction Of An Abstraction Pond And Ancillary Facilities At Gambas Avenue

Proposed Streetworks To Woodlands

Proposed Streetworks To Woodlands

Road Works


Proposed Streetworks To Woodlands Drive 17 / Champions Way / Woodlands Ave 1, 4 And 12

Proposed Streetworks To Woodlands

Proposed Streetworks To Woodlands

Road Works


Proposed Streetworks To Woodlands Drive 17 / Champions Way / Woodlands Ave 1, 4 And 12

Removal of Soil Embankment at Singapore Changi Airport

Removal of Soil Embankment at Singapore Changi Airport

Earthworks

Development of Hindhede Nature Park

Development of Hindhede Nature Park

Landscaping


Development of Hindhede Nature Park on Lot 1176 MK 16, Hindhede Nature Drive, Singapore

Earthworks at Ang Mo Kio

Earthworks at Ang Mo Kio

Earthworks & Drains


Earthwork and Drainage Diversion at Ang Mo Kio Ave 5 (Serangoon Planning Area)

Buggy Track and Drainage Improvement at Sime Course

Buggy Track and Drainage Improvement at Sime Course

Golf Course


Proposed Buggy Track and Drainage Improvement at Sime Course at Bukit Location for Singapore Island Country Club

Mount Faber Park Landscaping

Mount Faber Park Landscaping

Hardscaping


Hard Landscaping Works for the Redevelopment of Mount Faber Park