We have been serving Singapore as a leading infrastructure contractor, having delivered major public sector projects for the Singapore authorities, agencies and statutory boards.
Process Upgrading At Choa Chu Kang Waterworks Contract 2 – Ozone And Biologically Activated Carbon Facilities And Civil Works
Bishan Park
Bishan Park
ABC Waters Programme
ABC Waters Programme Proposed Development of Kallang River – Bishan Park (from Upper Thomson Road to Bishan Road)
Bukit Timah First Diversion Canal
Bukit Timah First Diversion Canal
Canal Improvement
Improvement to Bukit Timah First Diversion Canal Contract 3 (Holland Green to Clementi Road) (CJC-OKP JV 50:50)
Earthworks At Gali Batu
Earthworks At Gali Batu
Earthworks & Rock Excavation
Site clearance, Earthworks, Demolition and Rock excavation including stone blasting
J1018
J1018
Earthworks & Infrastructure Works
Advance Earthworks & Associated Works
TR238A
TR238A
Road Maintenance
Road Maintenance Contract for Central South and Central West
Changi Airport New Taxi Deck
Changi Airport New Taxi Deck
Building Works
Construction Of New Taxi Deck, Vehicular Bridges, Ramps And Associated Works At Singapore Changi Airport
Punggol Vehicular Bridge
Punggol Vehicular Bridge
Infra Works and Bridge
(A) Construction Of Sumang Walk (Part 4) And Vehicular Bridge Across Punggol Waterway
Sentosa Coach Park
Sentosa Coach Park
Building Works
Design And Construction Of Coach Parking Facility At Sentosa, Singapore
Tanglin Halt Infra
Tanglin Halt Infra
Flyover, Drains & Sewers
Proposed Construction Of Flyover, Drains, Sewers & Associated Works From North Buona Vista Drive To Commonwealth Avenue
Serangoon Reservoir
Serangoon Reservoir
ABC Waters Project
ABC Waters Project at Serangoon Reservoir, Sungei Pinang and Hougang Avenue 10 Part 1: Construction Works Part 2: Operation and Maintenance Services
Choa Chu Kang Pumping Station
Choa Chu Kang Pumping Station
Building Works
Construction of Pumping Station, Sewer Mains and Substation at Choa Chu Kang
Construction of Sentul Crescent Extension
Construction of Sentul Crescent Extension
Bridge Works
Project 1: Construction of Sentul Crescent Extension and Bridge over Punggol Waterway Project 2: Additions and Alterations to Seawall at Punggol Promenade
Buangkok Project
Buangkok Project
Earthworks & Infra Works
Construction Of Buangkok Crescent (Part), Buangkok Link (Part), Trunk Sewer, Site Clearance And Earthwork, Including Expunction Of Roads And Drainage Works In Hougang Town
Improvement To Sungei Pandan Kechil
Improvement To Sungei Pandan Kechil
Canal Improvement
ER393
ER393
Bridges and Flyovers Proposed Flyover At West Coast Highway Across Jalan Buroh
C8282
C8282
MRT Works
Major Outstanding Works At Macpherson And Upper Paya Lebar Stations
Bukit Panjang N6 Project
Bukit Panjang N6 Project
Earthworks
Site Clearance & Earthworks at Bukit Panjang N6
Box Culvert at Marymount
Box Culvert at Marymount
Box Culvert Project
Proposed Box Culvert From Marymount Lane To Marymount Road
ER204
ER204
Road Widening
Widening of Jurong Town Hall Road from PIE to Boon Lay Way and Jurong East Central to AYE
Bukit Batok & Choa Chu Kang Project
Bukit Batok & Choa Chu Kang Project
Earthworks & Drains
(A) Site Clearance & Earthworks at Bukit Batok Town N4 (Part- South) and Choa Chu Kang Town N8 (Part-South) (B) Construction of Outlet Drains at Choa Chu Kang Town N8 (Part- South)
Bukit Merah & Queenstown Project
Bukit Merah & Queenstown Project
Earthworks
Site Clearance And Earthworks At Bukit Merah C50A/B And Queenstown RC25A
CR1087
CR1087
Sewer and Water Diversion
Sewer And Water Diversion Works (Package E)
Tuas View Extension Phase 2B
Tuas View Extension Phase 2B
Infra Works
Proposed Construction of Roads, Drains & Sewer at Tuas View Extn Phase 2B
Sentosa Palawan Beach Project
Sentosa Palawan Beach Project
Coastal Works
PART A – Beach Improvement Works at Palawan Beach – Sentosa
Site Clearance and Earthworks No. 7 in Sengkang Neighbourhood 4
Site Clearance and Earthworks No. 7 in Sengkang Neighbourhood 4
Earthworks
H1007
H1007
Demolition, Pile Extraction and Advance Earthworks
Bukit Batok N4
Bukit Batok N4
Earthworks & Infra Works
(A) Earthworks and Slope Formation at Bukit Batok N4 (Phase 2) (B) Construction of Roads, Drains and Sewers at Bukit Batok N4 and Extension of Bukit Batok West Ave 8
Changi Airport Flyover
Changi Airport Flyover
Bridges and Flyovers
Construction Of New Taxi Deck, Vehicular Bridges, Ramps And Associated Works At Singapore Changi Airport
Improvement To Sungei Seletar
Improvement To Sungei Seletar
Canal Improvement
Earth Stockpile Site At Changi East
Earth Stockpile Site At Changi East
Earthworks
ER104
ER104
Road and Bridge Widening
Widening of Kranji Expressway from Bukit Timah Expressway To Pan Island Expressway
Road Works at Tuas South Way
Road Works at Tuas South Way
Infra Works
Construction of Road, Drains & Sewers at Tuas South Way
JTC C13102011
JTC C13102011
Infra Works
Construction of Roads, Drains, Sewers and Ancillary Works at Finger One, Tuas View Extension
Jurong Island
Jurong Island
Infra Works
Proposed Construction of Roads, Drains, Sewers and Service Tunnels at Meranti Ave Extn and Angsana Road, Jurong Island
Proposed Construction of Roads, Drains and Sewers at Tembusu Drive, Jurong Island
Proposed Construction of Roads, Drains and Sewers at Tembusu Drive, Jurong Island
Bridge Works
JTC 66/2004
JTC 66/2004
Infra Works
Construction of Roads, Drains, Sewers and Soil Improvement – Works at Meranti Crescent, Jurong Island
JTC 44/2006
JTC 44/2006
Infra Works
Construction Of Roads, Drains, Sewers And Soil Improvement Works at Tembusu Crescent, Phase B, Jurong Island
Construction Of Sewers in Jurong Island
Construction Of Sewers in Jurong Island
Sewer Line Works
Gambas Project
Gambas Project
Abstraction Pond
Construction Of An Abstraction Pond And Ancillary Facilities At Gambas Avenue
Choa Chu Kang Cemetery (Phase 3B
Choa Chu Kang Cemetery (Phase 3B
Cemetery Works
Proposed Redevelopment Of Choa Chu Kang Cemetery (Phase 3B)
Jalan Sendudok Project
Jalan Sendudok Project
Earthworks & Infra Works
Design Development and Construction of the Proposed Infrastructre Works at Jalan Sendudok/Canberra Link Area – 2nd Stage
Development of Choa Chu Kang Cemetery
Development of Choa Chu Kang Cemetery
Cemetery Works
Choa Chu Kang Cemetery (Phase 3A)
Choa Chu Kang Cemetery (Phase 3A)
Cemetery Works
Proposed Redevelopment Of Choa Chu Kang Cemetery (Phase 3A)
Construction of Canberra Street
Construction of Canberra Street
Infra Works
Construction of Canberra Street (Part 1) Canberra Crescent (Part 1) and Canberra Walk at Sembawang Town Neighbourhood 1
NUS Infra Works Project
NUS Infra Works Project
Infra Works
Proposed Infrastructure (Civil, Structural, Mechanical and Electrical) at the University Town, NUS
C426
C426
Expressway Construction
Kallang/ Paya Lebar Expressway
Physical Barriers at Pulau Ubin
Physical Barriers at Pulau Ubin
Coastal Works
Proposed Physical Barriers At Pulau Ubin And Safti Live Firing Area
Earthworks at Ang Mo Kio
Earthworks at Ang Mo Kio
Earthworks & Drains
Earthwork and Drainage Diversion at Ang Mo Kio Ave 5 (Serangoon Planning Area)
Changi Point Project
Changi Point Project
Coastal Works
Proposed Boardwalk at Western Coastline at Changi Point
Pulau Semakau Offshore Landfill Project
Pulau Semakau Offshore Landfill Project
Landfill Works
Pulau Semakau Offshore Landfill Facilities for the Operation and Maintenance of Landfill Equipment Vehicles
Warren Golf Course
Warren Golf Course
Golf Course
Development of Warren Golf and Country Club Golf Course at Choa Chu Kang Way
Buggy Track and Drainage Improvement at Sime Course
Buggy Track and Drainage Improvement at Sime Course
Golf Course
Proposed Buggy Track and Drainage Improvement at Sime Course at Bukit Location for Singapore Island Country Club
Mount Faber Park Landscaping
Mount Faber Park Landscaping
Hardscaping
Hard Landscaping Works for the Redevelopment of Mount Faber Park
Development of Hindhede Nature Park
Development of Hindhede Nature Park
Landscaping
Development of Hindhede Nature Park on Lot 1176 MK 16, Hindhede Nature Drive, Singapore
Construction of Temporary Access Road at the Southern Island
Construction of Temporary Access Road at the Southern Island
Road Works
Tuas View Reclaimed Land
Tuas View Reclaimed Land
Sludge Works
The Loading and Transportation of Sludge from Various Sewage/Sludge Treatment Works To Tuas View Reclaimed Land
Site Clearance and Infrastructure works for Stockpiling Site at Seletar
Site Clearance and Infrastructure works for Stockpiling Site at Seletar
Infra Works
Removal of Soil Embankment at Singapore Changi Airport
Removal of Soil Embankment at Singapore Changi Airport
Earthworks
Proposed Streetworks To Woodlands
Proposed Streetworks To Woodlands
Road Works
Proposed Streetworks To Woodlands Drive 17 / Champions Way / Woodlands Ave 1, 4 And 12
RD145
RD145
Bridge Works
Upgrading Of Vehicular Bridges At 10 Locations
Sentosa Causeway Bridge
Sentosa Causeway Bridge
Bridge Works
Proposed Diversion of Services, Construction of New Services Platform & Conversion of Walkway to Roadway at Sentosa Causeway Bridge, Gateway Ave
Tiong Bahru Project
Tiong Bahru Project
Drains & Sewers
Diversion of Drain & Minor Sewer Works at Kim Tian Road (Bukit Merah Planning Area) – Tiong Bahru
Lagoon Works at St John Island
Lagoon Works at St John Island
Dredging Works
Proposed Construction of Lagoon Works at St John Island
Drainage Improvement on Pulau Tekong Contract 1
Drainage Improvement on Pulau Tekong Contract 1
Drainage Work
Choa Chu Kang Waterworks
Choa Chu Kang Waterworks
Building Works
Process Upgrading At Choa Chu Kang Waterworks Contract 2 – Ozone And Biologically Activated Carbon Facilities And Civil Works
Bishan Park
Bishan Park
ABC Waters Programme
ABC Waters Programme Proposed Development of Kallang River – Bishan Park (from Upper Thomson Road to Bishan Road)
Bukit Timah First Diversion Canal
Bukit Timah First Diversion Canal
Canal Improvement
Improvement to Bukit Timah First Diversion Canal Contract 3 (Holland Green to Clementi Road) (CJC-OKP JV 50:50)
Serangoon Reservoir
Serangoon Reservoir
ABC Waters Project
ABC Waters Project at Serangoon Reservoir, Sungei Pinang and Hougang Avenue 10 Part 1: Construction Works Part 2: Operation and Maintenance Services
Improvement To Sungei Pandan Kechil
Improvement To Sungei Pandan Kechil
Canal Improvement
Box Culvert at Marymount
Box Culvert at Marymount
Box Culvert Project
Proposed Box Culvert From Marymount Lane To Marymount Road
Improvement To Sungei Seletar
Improvement To Sungei Seletar
Canal Improvement
Drainage Improvement on Pulau Tekong Contract 1
Drainage Improvement on Pulau Tekong Contract 1
Drainage Work
Tuas View Reclaimed Land
Tuas View Reclaimed Land
Sludge Works
The Loading and Transportation of Sludge from Various Sewage/Sludge Treatment Works To Tuas View Reclaimed Land
J1018
J1018
Earthworks & Infra Works
Advance Earthworks & Associated Works
TR238A
TR238A
Road Maintenance
Road Maintenance Contract for Central South and Central West
ER393
ER393
Bridges and Flyovers
Proposed Flyover At West Coast Highway Across Jalan Buroh
ER204
ER204
Road Widening
Widening of Jurong Town Hall Road from PIE to Boon Lay Way and Jurong East Central to AYE
C8282
C8282
MRT Works
Major Outstanding Works At Macpherson And Upper Paya Lebar Stations
CR1087
CR1087
Sewer and Water Diversion
Sewer And Water Diversion Works (Package E)
H1007
H1007
Demolition, Pile Extraction and Advance Earthworks
ER104
ER104
Road and Bridge Widening
Widening of Kranji Expressway from Bukit Timah Expressway To Pan Island Expressway
C426
C426
Expressway Construction
Kallang/ Paya Lebar Expressway
RD145
RD145
Bridge Works
Upgrading Of Vehicular Bridges At 10 Locations
Earthworks At Gali Batu
Earthworks At Gali Batu
Earthworks & Rock Excavation
Site clearance, Earthworks, Demolition and Rock excavation including stone blasting
Tanglin Halt Infra
Tanglin Halt Infra
Flyover, Drains & Sewers
Proposed Construction Of Flyover, Drains, Sewers & Associated Works From North Buona Vista Drive To Commonwealth Avenue
Jurong Island
Jurong Island
Infra Works
Proposed Construction of Roads, Drains, Sewers and Service Tunnels at Meranti Ave Extn and Angsana Road, Jurong Island
Road Works at Tuas South Way
Road Works at Tuas South Way
Infra Works
Construction of Road, Drains & Sewers at Tuas South Way
JTC C13102011
JTC C13102011
Infra Works
Construction of Roads, Drains, Sewers and Ancillary Works at Finger One, Tuas View Extension
Tuas View Extension Phase 2B
Tuas View Extension Phase 2B
Infra Works
Proposed Construction of Roads, Drains & Sewer at Tuas View Extn Phase 2B
JTC 44/2006
JTC 44/2006
Infra Works
Construction Of Roads, Drains, Sewers And Soil Improvement Works at Tembusu Crescent, Phase B, Jurong Island
JTC 66/2004
JTC 66/2004
Infra Works
Construction of Roads, Drains, Sewers and Soil Improvement – Works at Meranti Crescent, Jurong Island
Proposed Construction of Roads, Drains and Sewers at Tembusu Drive, Jurong Island
Proposed Construction of Roads, Drains and Sewers at Tembusu Drive, Jurong Island
Bridge Works
Construction Of Sewers in Jurong Island
Construction Of Sewers in Jurong Island
Sewer Line Works
Construction of Sentul Crescent Extension
Construction of Sentul Crescent Extension
Bridge Works
Project 1: Construction of Sentul Crescent Extension and Bridge over Punggol Waterway Project 2: Additions and Alterations to Seawall at Punggol Promenade
Buangkok Project
Buangkok Project
Earthworks & Infra Works
Construction Of Buangkok Crescent (Part), Buangkok Link (Part), Trunk Sewer, Site Clearance And Earthwork, Including Expunction Of Roads And Drainage Works In Hougang Town
Bukit Panjang N6 Project
Bukit Panjang N6 Project
Earthworks
Site Clearance & Earthworks at Bukit Panjang N6
Punggol Vehicular Bridge
Punggol Vehicular Bridge
Infra Works and Bridge
(A) Construction Of Sumang Walk (Part 4) And Vehicular Bridge Across Punggol Waterway (B) Construction Of Sumang Walk (Part 5) And Sumang Link (Part 2) (C) Construction Of Trunk Sewer No. 22 Along Sumang Walk And Sumang Link
Choa Chu Kang Pumping Station
Choa Chu Kang Pumping Station
Building Works
Construction of Pumping Station, Sewer Mains and Substation at Choa Chu Kang
Earth Stockpile Site At Changi East
Earth Stockpile Site At Changi East
Earthworks
Bukit Batok & Choa Chu Kang Project
Bukit Batok & Choa Chu Kang Project
Earthworks & Drains
(A) Site Clearance & Earthworks at Bukit Batok Town N4 (Part- South) and Choa Chu Kang Town N8 (Part-South) (B) Construction of Outlet Drains at Choa Chu Kang Town N8 (Part- South)
Bukit Merah & Queenstown Project
Bukit Merah & Queenstown Project
Earthworks
Site Clearance And Earthworks At Bukit Merah C50A/B And Queenstown RC25A
Sentosa Palawan Beach Project
Sentosa Palawan Beach Project
Coastal Works
PART A – Beach Improvement Works at Palawan Beach – Sentosa
Construction of Canberra Street
Construction of Canberra Street
Infra Works
Construction of Canberra Street (Part 1) Canberra Crescent (Part 1) and Canberra Walk at Sembawang Town Neighbourhood 1
Construction of Temporary Access Road at the Southern Island
Construction of Temporary Access Road at the Southern Island
Road Works
Site Clearance and Infrastructure works for Stockpiling Site at Seletar
Site Clearance and Infrastructure works for Stockpiling Site at Seletar
Infra Works
Site Clearance and Earthworks No. 7 in Sengkang Neighbourhood 4
Site Clearance and Earthworks No. 7 in Sengkang Neighbourhood 4
Earthworks
Bukit Batok N4
Bukit Batok N4
Earthworks & Infra Works
(A) Earthworks and Slope Formation at Bukit Batok N4 (Phase 2) (B) Construction of Roads, Drains and Sewers at Bukit Batok N4 and Extension of Bukit Batok West Ave 8
Construction of Sentul Crescent Extension
Construction of Sentul Crescent Extension
Bridge Works
Project 1: Construction of Sentul Crescent Extension and Bridge over Punggol Waterway Project 2: Additions and Alterations to Seawall at Punggol Promenade
Buangkok Project
Buangkok Project
Earthworks & Infra Works
Construction Of Buangkok Crescent (Part), Buangkok Link (Part), Trunk Sewer, Site Clearance And Earthwork, Including Expunction Of Roads And Drainage Works In Hougang Town
Bukit Panjang N6 Project
Bukit Panjang N6 Project
Earthworks
Site Clearance & Earthworks at Bukit Panjang N6
Punggol Vehicular Bridge
Punggol Vehicular Bridge
Infra Works and Bridge
(A) Construction Of Sumang Walk (Part 4) And Vehicular Bridge Across Punggol Waterway (B) Construction Of Sumang Walk (Part 5) And Sumang Link (Part 2) (C) Construction Of Trunk Sewer No. 22 Along Sumang Walk And Sumang Link
Choa Chu Kang Pumping Station
Choa Chu Kang Pumping Station
Building Works
Construction of Pumping Station, Sewer Mains and Substation at Choa Chu Kang
Earth Stockpile Site At Changi East
Earth Stockpile Site At Changi East
Earthworks
Bukit Batok & Choa Chu Kang Project
Bukit Batok & Choa Chu Kang Project
Earthworks & Drains
(A) Site Clearance & Earthworks at Bukit Batok Town N4 (Part- South) and Choa Chu Kang Town N8 (Part-South) (B) Construction of Outlet Drains at Choa Chu Kang Town N8 (Part- South)
Bukit Merah & Queenstown Project
Bukit Merah & Queenstown Project
Earthworks
Site Clearance And Earthworks At Bukit Merah C50A/B And Queenstown RC25A
Sentosa Palawan Beach Project
Sentosa Palawan Beach Project
Coastal Works
PART A – Beach Improvement Works at Palawan Beach – Sentosa
Construction of Canberra Street
Construction of Canberra Street
Infra Works
Construction of Canberra Street (Part 1) Canberra Crescent (Part 1) and Canberra Walk at Sembawang Town Neighbourhood 1
Construction of Temporary Access Road at the Southern Island
Construction of Temporary Access Road at the Southern Island
Road Works
Site Clearance and Infrastructure works for Stockpiling Site at Seletar
Site Clearance and Infrastructure works for Stockpiling Site at Seletar
Infra Works
Site Clearance and Earthworks No. 7 in Sengkang Neighbourhood 4
Site Clearance and Earthworks No. 7 in Sengkang Neighbourhood 4
Earthworks
Bukit Batok N4
Bukit Batok N4
Earthworks & Infra Works
(A) Earthworks and Slope Formation at Bukit Batok N4 (Phase 2) (B) Construction of Roads, Drains and Sewers at Bukit Batok N4 and Extension of Bukit Batok West Ave 8
Sentosa Coach Park
Sentosa Coach Park
Building Works
Design And Construction Of Coach Parking Facility At Sentosa, Singapore
Sentosa Causeway Bridge
Sentosa Causeway Bridge
Bridge Works
Proposed Diversion of Services, Construction of New Services Platform & Conversion of Walkway to Roadway at Sentosa Causeway Bridge, Gateway Ave
Jalan Sendudok Project
Jalan Sendudok Project
Earthworks & Infra Works
Design Development and Construction of the Proposed Infrastructre Works at Jalan Sendudok/Canberra Link Area – 2nd Stage
Choa Chu Kang Cemetery (Phase 3B)
Choa Chu Kang Cemetery (Phase 3B)
Cemetery Works
Proposed Redevelopment Of Choa Chu Kang Cemetery (Phase 3B)
Choa Chu Kang Cemetery (Phase 3A)
Choa Chu Kang Cemetery (Phase 3A)
Cemetery Works
Proposed Redevelopment Of Choa Chu Kang Cemetery (Phase 3A)
Development of Choa Chu Kang Cemetery
Development of Choa Chu Kang Cemetery
Cemetery Works
Pulau Semakau Offshore Landfill Project
Pulau Semakau Offshore Landfill Project
Landfill Works
Pulau Semakau Offshore Landfill Facilities for the Operation and Maintenance of Landfill Equipment Vehicles
Changi Point Project
Changi Point Project
Coastal Works
Proposed Boardwalk at Western Coastline at Changi Point
Physical Barriers at Pulau Ubin
Physical Barriers at Pulau Ubin
Coastal Works
Proposed Physical Barriers At Pulau Ubin And Safti Live Firing Area
Lagoon Works at St John Island
Lagoon Works at St John Island
Dredging Works
Proposed Construction of Lagoon Works at St John Island
Tiong Bahru Project
Tiong Bahru Project
Drains & Sewers
Diversion of Drain & Minor Sewer Works at Kim Tian Road (Bukit Merah Planning Area) – Tiong Bahru
NUS Infra Works Project
NUS Infra Works Project
Infra Works
Proposed Infrastructure (Civil, Structural, Mechanical and Electrical) at the University Town, NUS
Gambas Project
Gambas Project
Abstraction Pond
Construction Of An Abstraction Pond And Ancillary Facilities At Gambas Avenue
Proposed Streetworks To Woodlands
Proposed Streetworks To Woodlands
Road Works
Proposed Streetworks To Woodlands Drive 17 / Champions Way / Woodlands Ave 1, 4 And 12
Proposed Streetworks To Woodlands
Proposed Streetworks To Woodlands
Road Works
Proposed Streetworks To Woodlands Drive 17 / Champions Way / Woodlands Ave 1, 4 And 12
Removal of Soil Embankment at Singapore Changi Airport
Removal of Soil Embankment at Singapore Changi Airport
Earthworks
Development of Hindhede Nature Park
Development of Hindhede Nature Park
Landscaping
Development of Hindhede Nature Park on Lot 1176 MK 16, Hindhede Nature Drive, Singapore
Earthworks at Ang Mo Kio
Earthworks at Ang Mo Kio
Earthworks & Drains
Earthwork and Drainage Diversion at Ang Mo Kio Ave 5 (Serangoon Planning Area)
Buggy Track and Drainage Improvement at Sime Course
Buggy Track and Drainage Improvement at Sime Course
Golf Course
Proposed Buggy Track and Drainage Improvement at Sime Course at Bukit Location for Singapore Island Country Club
Mount Faber Park Landscaping
Mount Faber Park Landscaping
Hardscaping
Hard Landscaping Works for the Redevelopment of Mount Faber Park