Ever San Construction Pte Ltd

EARTHWORKS & INFRA WORKS

Jalan Sendudok Project

PROJECT DETAILS

Client:

Urban Redevelopment Authority ( URA)

Location:

Jalan Sendudok/Canberra Link Area

Project Completion:

April 2018

Design Development And Construction Of The Proposed Infrastructre Works At Jalan Sendudok/Canberra Link Area - 2nd Stage

Scope of works:

Design 26.2m wide access road, 600mm & 450mm dia Sewer lines, drains(0.6m, 0.75m & 1m), culverts, for strengthening existing 3-cell box drain, new 3-cell culvert with 11m X 3m size of each cell, Tree planting, street lighting. Earthworks, roads, drains, 3-cell culverts, Sewers & Monholes, Tree planting, Grass turfing and miscellaneous works